Price each part of the building against its own construction, even when the finished appearance is intended to match.

Call 01623 579297

Illustrative bungalow with a coarse pebbledash exterior.

When planning pebbledash removal in Cotgrave, distinguish the original house from later additions and identify the brickwork that will remain visible. A rough coating can make those parts look similar while concealing different backgrounds or previous repairs. A useful quotation sets the removal boundary on each part and connects the work to any other refurbishment already planned. Call 01623 579297 with the location and the elevations involved. Have the extension drawings, if available, and recent photographs ready so the construction history can be discussed.

Separate the main house from the addition

Rushcliffe’s report for Cotgrave application 18/00823/FUL describes a brick house with a rendered feature on its front. It also records an existing single-storey rear extension that the proposal would retain. These are two scoped observations from the historical case, useful when considering how a partial finish and a later addition should be described separately.

On your building, give the house and extension different labels in the scope. Identify where their walls meet and whether the same coating continues across the junction. Record what is known from drawings and what still needs inspection. This prevents an allowance based on one construction being assumed to cover a different part of the building.

Retain the exposed brick deliberately

Where the rough finish covers only a feature panel, draw its edges against the surrounding brickwork. Include returns around windows and any strip beneath the sill. Ask whether the proposed removal is limited to that panel or also includes previous repairs which have spread beyond it.

The condition of the border matters to the replacement detail. Photograph existing chips, patches and staining before protection is fitted. Agree how the retained brick will be protected and who will assess any damage found beneath the edge of the coating. Keeping those tasks explicit avoids treating brick repair as an incidental part of stripping.

Illustrative transition from coarse pebbledash to smooth render.

Coordinate access above the extension roof

If work is required on the house wall above a lower roof, show that arrangement when requesting the survey. Identify rooflights, drainage and fittings that may be close to the removal area. The access plan should explain how the wall will be reached and how the roof below will be protected during stripping and repair.

A lower roof should not be treated as an assumed working platform. HSE’s work-at-height guidance requires suitable equipment and planned, competent work. Ask the access provider to account for each stage, including the trial and the inspection, so the final finish is not the only task considered when arranging access.

House and extension work schedule
Part of the buildingQuestion to resolveQuotation item
Front feature panelWhich brick edges remain?Removal boundary and protection
Extension wallIs its background different?Separate trial and preparation
House above lower roofHow will the wall be reached?Access and roof protection
Junction between phasesWhat does inspection reveal?Repair or specialist assessment before covering

Sequence removal around the other trades

Tell the contractor if doors, windows, gutters or roof coverings are also being changed. Agree the order so the wall finish is not completed immediately before another trade needs to disturb it. Identify temporary arrangements for openings and rainwater fittings during the interval between removal and reinstatement.

For a staged refurbishment, specify what each phase leaves ready for the next. That includes the condition of the background, the protected edges and the records of repairs already completed. If different contractors handle the house and the extension, give both the same junction drawing and a named person to resolve changes.

Inspect both backgrounds before the final specification

Use the trial and open-wall inspection to establish whether the same replacement approach is suitable for both parts. Record changes in masonry, old repairs and the way the wall junction is formed. Where the construction needs further assessment, agree that before the new covering is ordered or applied.

The repair price should describe the work that has actually become visible. Ask which items are included in the main contract and which are conditional on another finding. Confirm any revised extent on the drawing, with the cost and authorisation recorded while the relevant area can still be seen.

Illustrative masonry exposed for assessment of an old wall.

Agree matching appearance without losing construction detail

A common colour or texture can bring an extension and house together visually. It does not establish that the layers beneath should be identical. Ask for the specified build-up for each background and a clear detail where the two parts meet. The sample should show the intended visual relationship beside retained brickwork.

At the final review, inspect the original feature-panel edges, the extension returns and the wall above the lower roof. Keep the photographs of concealed repairs alongside the product information. Record any separate roofing, window or fitting work still to be completed so the finishing contractor’s handover does not obscure another trade’s remaining task.

Questions and answers

Can the house and extension have one removal price?

They can appear in one quotation, but the areas and assumptions should be distinguishable. Ask for separate notes on backgrounds, access and junctions. That makes it easier to understand a variation if opening one part reveals work that the other part does not need.

Can the front brickwork be left exposed?

Yes, if that is the agreed design and the removal can be completed with a suitable boundary. Mark the retained areas and assess their condition before work starts. A trial and protection plan should address the brick edge, with any repair priced separately once its extent is known.

Local context

The report for application 18/00823/FUL describes an existing brick house with a rendered front feature.

Individual Cotgrave application site; not a town-wide housing descriptionEvidence period: Historical 2018 application report; paragraph 1Source checked: 23 November 2026Planning report: application 18/00823/FUL, Cotgrave

The same report identifies a single-storey rear extension which the proposal would retain.

Same Cotgrave application siteEvidence period: Historical 2018 application report; paragraph 1Source checked: 23 November 2026Planning report: application 18/00823/FUL, Cotgrave